Test shipment: why, what volume and what to measure
·13 min read read·Delivery Pro China
A test shipment is a real delivery handled by a new logistics provider alongside your current one, so you can compare results rather than promises. A small shipment is usually enough: it goes through every stage of the process and shows you the final cost at your warehouse, the actual timeline for each stage and how the provider responds to the first unexpected issue.
- Test format
- in parallel with the current contractor
- Minimum volume
- 50 kg, better value to consolidate from 150 kg
- Main metric
- total at your warehouse per unit of usable goods
- Quote validity
- 7 days
- What we record before the test
- price, timing by stage, scope of services
An operator's presentation describes how the process is designed. A test shipment shows how it works on your product range, your suppliers and your city. Only the second is worth comparing.
Why run a test before moving all shipments
An established importer already has a working arrangement. Even if it is inconvenient and more expensive than you would like, it is predictable: you know the timing, you know whom to call, and you know where problems usually arise. Moving the entire volume to a new contractor on the strength of a commercial proposal trades predictability for the unknown, and does so across the whole purchasing programme at once.
A test splits that decision in two. First you get the facts on one batch, then you decide on volume. The cost of a mistake in the first case is limited to a single delivery; in the second it is a quarter of sales.
There is a second reason, unrelated to risk. A test gives you comparison data that neither you nor the operator has at present. Before the test the conversation is about rates and promises; afterwards it is about specific lines in a calculation and specific dates. This is the only way to test the full shipment cost method on your own figures.
Finally, a test checks not the logistics but the fit. How the operator asks questions, how it reacts to a change in the order, what it does when there is a discrepancy, how easy your buyer finds it to work with them. None of this is measured in a per-kilogram rate, yet it is exactly what determines how much of your team's time shipments will take.
Why the test runs in parallel with the current contractor rather than instead of it
Replacing your contractor for the duration of the test deprives you of a reference point. If the current arrangement is stopped, there is nothing to compare the new figures with – all that remains is a subjective feeling that things got better or worse. A parallel test gives you two deliveries in the same period and under the same market conditions.
The second motive is practical. While the test runs you are not left without goods if something goes wrong. The absence of deadline pressure also changes the quality of your observation: you watch the process instead of fighting a fire.
The third motive concerns suppliers. In a parallel test you are not moving all your purchasing from a supplier to a new operator; you hand over part of an order or a single SKU. The relationship with the supplier does not change, and they do not read it as a change in the terms of business.
Do not put into the test a batch on which a sales launch or a commitment to a customer depends. The test should be representative but not critical: otherwise you will assess any deviation as an emergency rather than as data.
What volume is sufficient for a test
A test shipment should be large enough to go through every stage of the standard process without being handled as an exception. We accept shipments from 50 kg, which is usually sufficient. The test is about the process, and its core stages are the same for small and large shipments: collection from the supplier, goods receipt, inspection, packing, freight, documentation and last-mile delivery.
A shipment of that size gives you every line in the quote and a date for every stage. It will not show the effects of scale, such as how the provider handles a full vehicle or palletised freight. Price also needs context: the cost per kilogram on a minimum-size shipment is noticeably higher than on a shipment of 150 kg or more, because fixed costs – collection, goods receipt, packing and last-mile delivery – are spread over fewer kilograms. The test tells you whether the process works, not what annual-volume pricing will look like.
A reasonable benchmark for choosing the volume is below.
- The batch passes through every stage without manual exceptions or shortcuts
- It contains more than one SKU: otherwise item reconciliation is not tested
- Preferably two suppliers: this tests consolidation and synchronisation
- The goods are typical for you in density and fragility, not the most convenient ones
- The value of the batch is such that losing it does not ruin your month
- The timing is not tied to an advertising launch date or a commitment to a customer
The second most common question is how many batches are needed. One batch shows the price and the timing. Two batches show repeatability, and for regular purchasing that matters more than price. If your schedule allows, it is better to plan two in a row and see whether they are calculated under the same rules.
What to measure during the test
Six groups of parameters are measured. Five of them are visible straight away; the sixth only if something did not go to plan, and it is the most informative.
Final cost at your own warehouse
Not the per-kilogram rate but the sum of all blocks up to the moment of unloading. It is calculated per unit of usable goods: the total is divided by the number of units you can sell, not by the number ordered. It is this figure that is compared with your current arrangement, calculated under the same rules.
Actual timing by stage
A single overall lead time says little. What you need are dates by stage: payment to the supplier, dispatch from the supplier, goods receipt at the warehouse, readiness for dispatch, departure of the shipment, arrival in the city, unloading at your premises. That shows exactly where time is lost and who influences it.
Condition of the cargo
Number of pieces, integrity of the packaging, defects and shortfall in the end. Separately: whether what was recorded at goods receipt in China matches what you received at your own premises. A difference between these two points points to the carriage; a match points to the supplier.
Completeness of documents
Whether the set your accounting department needs arrived, and whether it arrived on time. This is checked on the actual set, not on a list from a presentation: invoice, packing list, transport documents and, under official import, the full declaration set.
Quality of communication
How many times you had to ask about status yourself. Whether updates arrived before you requested them. How many people you had to keep in the correspondence and whether you had to connect the participants in the chain yourself. This is a direct measure of the load on your buyer.
The first non-standard situation
The most valuable outcome of a test. The supplier shipped the wrong thing, part of the goods was late, the cargo was delayed, the rate changed – what matters is what happened next. Whether you were warned in advance or found out after the event, whether you were offered options or informed of a decision, whether the price changed unilaterally.
| Stage | What we measure | What confirms it |
|---|---|---|
| Calculation before the order | Completeness of the breakdown by block and the quote validity | A written calculation with a date, stating what is included and what is not |
| Payment to the supplier | Time from request to confirmation of payment, size of the fee | Confirmation of payment and the fee line in the calculation |
| Collection from the supplier | Time from readiness of the goods to collection, number of collections | Date of collection and the consignment note for the domestic carriage within China |
| Goods receipt at the warehouse | Number of pieces, actual weight and dimensions, time taken for receipt | A receipt record or summary, shots of the scales and the measuring |
| Inspection of the goods | Match of SKUs and quantities, defects found | A photo report with piece numbers and a summary of discrepancies |
| Packing and preparation | Volume increase after repacking, quality of palletising | Before-and-after shots, re-measurement and re-weighing |
| International carriage | Departure date, arrival date, chargeable weight on the invoice | Transport documents and the final invoice with the chargeable weight |
| Documents | Completeness of the set and the date it was received | The set of documents itself and the correspondence with dates |
| Last mile | Time from arrival in the city to unloading, cost of unloading | Date of unloading and the last mile line on the invoice |
| Goods receipt at your premises | Actual defects and shortfall, difference from the receipt in China | Your goods receipt record set against the photo report from Guangzhou |
| Non-standard situation | Time to notification, availability of options, change in price | Correspondence with dates and the final invoice against the original calculation |
| Total | Cost of the batch at your warehouse per unit of usable goods | The sum of all invoice lines divided by the usable quantity |
What a test will not show
A single batch has a limit to how much it can tell you. Below is what a test does not check, and it is more honest to know this in advance than to draw conclusions from one delivery that it cannot support.
- Behaviour at volume: discounts, filling a vehicle, handling palletised cargo
- Resilience to seasonal peaks: before Chinese New Year the chain behaves differently
- Stability of timing: one batch gives a point, not a range
- Behaviour when market rates change, if they did not change during the test
- Handling of rare categories, if the test goods did not belong to them
- What happens in a major failure: a test usually runs without serious incidents
- Long-term handling of claims against suppliers, which takes weeks
- The quality of work with official import, if the test ran under the cargo scheme
From this follows a simple conclusion: a test answers the question of whether to increase the new operator's share, not the question of whether to move everything at once. The second question is settled at volume.
How to record the terms before the test
If the starting terms are not written down, there will be nothing to compare against once the test is over: memory adjusts to fit the result. Recording them takes half an hour and is done once, before the order.
- Describe the cargo: items, quantities, suppliers and their cities, weight and dimensions of each piece
- Write down the current figures: what this same batch would cost under your existing arrangement, by the same blocks
- Write down the current timing by stage, not one figure from order to receipt
- Obtain the new operator's calculation as a breakdown by block, with a date and a validity period
- Record the scope of services: what is included, what is charged separately, what is not available at all
- Record the chargeable weight rule and what happens if the dimensions change
- Record the rules for price changes: under what conditions the invoice may differ from the calculation
- Agree the inspection brief: what to open, count, measure and photograph
- Agree what to do by default if there is a discrepancy: wait for a top-up delivery or ship the good units
- Appoint who on your team runs the test and where the documents and correspondence are kept
Rates change, so compare quotes that are valid on the same date. Compare the recorded figure with your current provider's quote for the same period, not with last year's invoice.
Figures to agree before sending the test shipment
A quote with no specific amounts gives you nothing to compare. The figures below are the ones we provide before a test shipment, as at 20 August 2026. Ask every provider for the same information, including your current one.
| Parameter | Our terms | Why it matters for the test quote |
|---|---|---|
| Minimum weight | The provider's minimum should be stated in its terms; a larger shipment usually has a lower cost per kilogram | Check whether the test will cost more per kilogram than a regular shipment |
| Chargeable-weight rule | For road freight the rule depends on the density in the route rate card; air express has no threshold, and each package is charged by volumetric weight using the carrier's conversion factor | Without this rule, the final invoice may differ from the quote |
| Packing | Bag and tape – $5 per package, corner protectors and a bag – $6 per package, a wooden crate for small boxes – $15–25, a crated pallet – $30 per cubic metre | Compare the scope of services, not just the freight rate |
| Collection within China | At the carrier's actual charge or a $20–50 surcharge | Collection is charged twice when there are two suppliers |
| Storage | No storage fees | Check that waiting for a second supplier will not generate a storage charge |
| Mandatory carrier cover | Kazakhstan by road – $5 per kg; cover for other routes is confirmed when quoting | Check the scope of cover: loss, theft and non-delivery. |
| Quote validity | Specified in the quote | Compare figures from the same week, not different months |
| Destination | Mode | Transit time |
|---|---|---|
| Kazakhstan | Road | 10–15 days |
| Uzbekistan | Road | 15–20 days on the accelerated route; 20–35 days on the economy route |
| Ukraine | Air | 4–7 days for the air leg, plus 3–4 days for collection from Poland and customs clearance |
| Europe | Air | 12–20 days to the consignee's address |
These ranges are the baseline for assessing the actual result. If the international leg takes longer, ask which stage caused the delay instead of debating the headline lead time. Record the timing of each stage so any delay can be traced. Mandatory cover for the international leg is provided by the carrier. This cover does not include cargo damage; liability for damage is determined by the contract of carriage and any applicable convention.
Twelve points: what to compare in an operator after the test
Go through the list immediately after unloading, while the correspondence and documents are to hand. Each point is closed by a fact, not an impression.
- The final cost of the batch at your warehouse, calculated per unit of usable goods, against the same figure under your current arrangement
- Whether the final invoice matched the original calculation line by line, and exactly what diverged
- Actual timing for each stage against what was promised, with a note of where time was lost
- The chargeable weight on the invoice: by actual or volumetric weight, and whether the factor was stated in advance
- The actual scope of services: what you had to buy in addition to the original scope
- Goods receipt in China: whether you received a photo report, and whether the quantity can be counted and the SKUs read from it
- Discrepancies found before dispatch, and what was done about them before the international carriage
- Defects and shortfall at your own goods receipt: how many, and whether this matches the receipt in Guangzhou
- Condition of the packaging after the carriage and the adequacy of the cargo preparation
- Completeness and timeliness of the documents for your accounting department
- Communication: how many times you asked about status yourself and whom you had to connect with whom
- The first non-standard situation: when you were warned, what options you were given and who paid for the consequences
A useful habit is to fill in the same list for your current contractor on their next batch. Comparing two completed lists is more informative than any argument about rates.
What the transition looks like after a successful test
A successful test is not an instruction to move everything. The sensible approach is to increase the share in stages, starting with the destinations and categories where the new arrangement produced a measurable advantage.
You go through the twelve points together with the operator. Every difference between the calculation and the facts is discussed separately: the cause and what changes in the process.
You repeat the test on a similar batch in order to see repeatability rather than a one-off result. Check whether it is calculated under the same rules.
You move one product group or one supplier entirely. Regularity appears, along with a repeatable inspection brief and accumulated data on dimensions.
You add a country or city where the new arrangement wins on the total at your warehouse. You check the documents for that specific country of import.
You move the rest once you have statistics from at least several batches and across both delivery schemes that you need.
How this works with us is described on the page about moving from your current contractor. Individual blocks of the process – payment to the supplier, the warehouse in Guangzhou, inspection of goods and consolidation – can be tested separately if you do not need the whole cycle at once.
Common mistakes in a test
| Mistake | What it leads to | How to do it differently |
|---|---|---|
| Too small a batch | It is handled manually as an exception, so the process is not tested | Use the smallest volume the provider handles as a standard shipment; as volume increases, fixed costs are spread across more weight |
| Atypical goods | The result cannot be transferred to your normal purchasing: different density and fragility | Take goods that are typical for you in dimensions, weight and packing requirements |
| One SKU from one supplier | Item reconciliation and consolidation are not tested | Take several SKUs, from two suppliers where possible |
| No record of the starting terms | There is nothing to compare against and the assessment comes down to impressions | Write down your current price and timing by stage before the order |
| A batch that is critical on timing | Any deviation is assessed as an emergency rather than as data | Put into the test a batch that is not tied to a sales launch date |
| Comparing rate against rate | The cheap rate wins, and the total at the warehouse turns out to be higher | Compare the total at your own warehouse per unit of usable goods |
| A test instead of the current arrangement | The reference point disappears and you risk being left without goods | Run the test in parallel with your current contractor |
| Conclusions from one batch | A one-off result is taken as the norm for the process | Check repeatability on a second batch before increasing the volume |
The temptation to make the test as convenient as possible deserves a separate mention. If you hand over the densest goods from your most disciplined supplier to the most convenient city, anyone will pass the test. A test is useful in exactly the measure that it resembles your normal purchasing.
If you want to start, put together a description of your next batch and request a breakdown in the calculator. Questions about terms and the minimum volume are collected in the questions section.
FAQ
What minimum weight do I need in order to try a new logistics provider
A shipment from 50 kg is sufficient – this is our minimum, and it goes through every stage of the standard process: collection from the supplier (at carrier cost or a $20–50 surcharge), goods receipt, inspection, packing from $5 per package, freight, documents and last-mile delivery. Consolidating from 150 kg offers better value: at the minimum volume, the cost per kilogram is noticeably higher. A shipment this size will not show the effects of scale, but it will show you the process and every line in the quote.
Do I need to stop my current contractor for the duration of the test
No, the test runs in parallel. That way you keep a reference point for comparison under the same market conditions and avoid the risk of being left without goods. It is enough to put part of an order or one or two SKUs into the test, without changing your relationship with the supplier.
How do I tell from the test whether it really got cheaper
Compare the final cost of the batch at your own warehouse, divided by the quantity of usable goods, with the same figure under your current arrangement for the same week. A calculation is valid for 7 days, so you need to compare current figures, not last year's invoice.
What should I do if something goes wrong during the test
That is the most useful part of the test, not its failure. Record three things: when you were warned, what options you were offered and who paid for the consequences. A discrepancy that was named in advance with options for resolving it says more about the process than a batch that went perfectly.